View a larger image of the Zoning Map
Introduction
This private plan change request seeks to:
a) Rezone 95 hectares (approx.) of rural zoned land, within the Mangawhai Harbour overlay to a mix of residential and commercial zoned land as follows:
|
6.3450 ha |
|
45.4909 ha |
|
12.560 ha |
|
2.655 ha |
|
2.235 ha |
|
24.69 ha |
Total Area |
94 ha |
b) Create a Development Area containing a suite of planning provisions to control and manage subdivision, use and development within the Plan change area.
c) Apply a Coastal Hazard overlay over the land area identified to be potentially subject to coastal hazard where the effects of potential mitigation measures will need to be managed.
d) Incorporate a Structure Plan into the Development Area to visually depict key features and outcomes required.
e) Include Ecological features maps to convey areas of ecological sensitivity for future protection.
f) Include the Structure Plan map to visually depict key outcomes that will be secured.
Current status
Council has accepted the application, and it is now open for submissions until 18 August 2025.
Application and additional information
- Application for Private Plan Change - Mangawhai East (Note documents linked with the application letter are listed below as appendices)
- Section 32 Planning Report Mangawhai East
- Appendix 1: Aerial Photograph
- Appendix 2: Planning Maps
- Appendix 3: Development Area Provisions
- Appendix 4: Structure Plan
- Appendix 5: Cultural Effects Assessment
- Appendix 6: Archaeological Assessment
- Appendix 7: Landscape Values Assessment
- Appendix 8: Coastal Hazards Assessment
- Appendix 9: Geotechnical Assessments
- Appendix 10: Civil Engineering Assessment
- Appendix 11: Stormwater Management Plan
- Appendix 12: Soil Contamination Assessment
- Appendix 13: NPS HPL Assessments
- April 2025 - Clause 3.6
- May 2025 - Clause 3.10
- Appendix 14: Ecological Assessments
- Appendix 15: Economic Assessment
- Appendix 16: Integrated Transport Assessment
- Appendix 17: Urban Design Assessment
- Appendix 18: Engagement Report
Process for review
Council accepted to process Private Plan Change 85 at the Council meeting on 25 June 2025.
Submissions
Submissions
Submissions can be made via the online form or by completing the PPC85 Submission Form 5. Submissions are to be made in writing and must be received by 5.00pm on Monday 18 August 2025.
- Online Submission
- PPC85 Form 5 Submission form (downloadable)
Notifications