MCWWS Extension Project

 

MCWWS-Project

The Mangawhai Community Wastewater Scheme (MCWWS) Extension Project

Thank you to all those that attended the Open Day, Easter Saturday and to those who provided feedback.  For more information on the Open Day in April 2015, please  click on the link on right.
 
The Panel presented their recommendations report to the Council on 28 July 2015.  
The Panel's report is available click on right.

MCWWS Extension Project – Stage II
To view the report to Council on the Advisory Panel’s Recommendations Report refer link on right.

To view the MCWWS Status Update click  refer link on right  (November 2016).
 
An open letter from Kaipara District Council to the Mangawhai Community Wastewater Scheme (MCWWS) Advisory Panel
You may recall Council appointed a group of ratepayers from within the Mangawhai community to undertake a review of the MCWWS.  Called the Community Advisory Panel, they were to provide independent and objective input into Council’s decision-making processes around the possible extension of the MCWWS.  Council received the Panel’s report in July 2015.  In response to the Panel’s Report and specifically the 22 recommendations given, please view the open letter to find the Council's responses, clustered under theme headings.  
 

Project Overview


The MCWWS services part of the Mangawhai Drainage District through a reticulated network of pipes connecting properties to the treatment plant.  A further network of pipes connects the plant to a holding dam on Browns Road Farm.

Disposal occurs through a further network of pipes on the Farm that distributes treated water on fields covering part of available farmland.  The capacity of the plant can cater for about twice the number of current connections.  Disposal capacity through the current irrigation reticulation is at its limit.  In order to increase connections to the plant, the reticulation needs to be extended to other parts of the drainage area and the disposal capacity needs to also increase.

There are a number of options for how the reticulation network is extended, how the capacity for disposal is increased and how the extension is funded.

Decisions on the preferred option are required.  These decisions will be made with input from a community-based Advisory Panel.
 
 

Open Day Information


Panel's Report


Panel's Recommendations Report


MCWWS Status Updates


Background Information on the Scheme


Terms of Reference for the Community 

Advisory Panel


Meet the Members of the Community Advisory Panel


Whats New


A-Z of Documents

 

       
       

 

 

 

 

 

 

 


 
Name
Email Address

FOLLOW US

facebook twitter google plus SHARE THIS
   

CONTACT US

0800 727 059 or 09 439 3123 

 
cant find what you looking for